An Environmental Impact
Assessment (EIA) study has been undertaken to assess the environmental
impacts (including noise, air, water, construction waste, visual,
landscape and land use during the construction and operation phases
of the project) and to identify appropriate mitigation measures.
The EIA Report was approved by EPD under the EIA Ordinance and an
Environmental Permit was granted for the construction and operation
of the designated project. The recommended mitigation measures in
the Environmental Permit have been incorporated into the project.
These include:
 |
Extensive planting and high quality
hard landscaping adjacent to the new roads |
 |
Maximum use of excavated material
arising from formation project at Jordan Valley |
 |
Restricted dredging and filling
rates |
 |
Regulated
disposal of dredged material to designated dumping areas |
 |
Use
of silt curtains around dredging and filling areas, and
filling behind new seawalls where possible |
|